HITCO Demonstrated...
• Reduction in Cost- 54%
• Reduction in Weight- 24%
• Tail Cone
• Rudder Tip & Fairing
• Vapor Barrier
• Stuffing the Tail Cone
Working with Boeing HITCO demonstrated:
• Initial design developed with Boeing IPT
- Cost reduction to Boeing- 54%
- Weight Savings to Boeing- 24%
• Significant parts count reduction concept
• 8’ x 11’ x 12’ one piece structure
• Contract awarded to HITCO in 1995
• Demonstrates Value Stream Analysis (VSA)
• HITCO granted MRB authority, part shipped directly to line
• One Tail Cone is shipped every three weeks
• 150 each Tail Cones delivered to Boeing since contract award
• 1997 received BOEING Silver Eagle Award- FirstTime Quality
• 2006 received BOEING Silver Eagle Award- Supply Chain Mgmt
HITCO CONTINUED WORKING WITH ITS CUSTOMER PRODUCING ADDITIONAL SAVINGS PLUS INCREASES BACK LOG – SAVINGS TO ITS CUSTOMER – AND ANOTHER SILVER EAGLE AWARD.